文章正文
Commissioning and Calibration of DAS7 OCS Comprehensive Maintenance Vehicle were successfully completed
Author:admin    Released:2014-09-27 16:44:09    Word:【Big】【Mewium】【Small
  Commissioning and Calibration of DAS7 OCS Comprehensive Maintenance Vehicle were successfully completed on September 24. Carbody strength, bogie lock, power &drive system and entire car control system etc. performances are favorable. Work range, work cases fitness performances reached domestic advanced level.
    The completion of commissioning and calibration marked a great step of DAS7 OCS Comprehensive Maintenance Vehicle, which indicates technology strength on entire car integration, light weight of car-body, vehicle control and bogie lock and laid foundations for large maintenance machinery of CSR Baoji Times.
Footnotes Info

Baoji CRRC Times Engineering Machinery Co.,Ltd.,2014-2020 ,Copyright (C) Reserved, No.090919100, on record of ICP, Shaanxi

      <b id="4do554" ><center id="4do554" ></center></b>

    1. <code id="4do554" ><font id="4do554" ></font></code>
      <noframes id="4do554" ></noframes><small id="4do554" ><input id="4do554" ></input></small>
      <label id="4do554" ></label><th id="4do554" ><output id="4do554" ></output></th>

      <object id="4do554" ><delect id="4do554" ></delect></object>